

Full Student Name
Student ID
Please note that a delay in assessment submission will result in the following grade deduction:
• 1 Day – 10% Deduction
• 2 Days – 20% Deduction
• 3 Days – 40% Deduction
• 4 Days – 50% Deduction
• 5 Days – 100% Deduction
Also note that in case of plagiarized submission, you will receive a notification email with a penalty (see below) effective from the date of the email:
• Resubmission on the first day (within 24 hours after notification): 20% deduction
• Resubmission on the second day after notification: 30% deduction
• Resubmission on the third day after notification: 50% deduction
• Failing to resubmit within three days after notification, the assessment will be graded with zero.
Note:
Please upload your answer on Weekly Assignment 3 Submission Link.
1. What are the main differences between a manufacturing supply chain and a service supply chain? To support you answer you need to provide a diagram for both supply chain. (25 points)
2. What are some of the main obstacle that must be overcome in converting from a traditional system to lean operation system? (25 Point)
3. What do you think are the important ethical considerations related to managing the supply chain in current organizations? (20 points)
4. The design and operation of a lean system provide the foundation for accomplishing the aforementioned goals. As a result of that, identify and briefly explain the main building blocks of the lean operation system? (30 points)
The End