RFP Assignment
CMCET 833
SP 2020
150 points
Due May 12, 2020
Part A
Project list:
1 DFW Connector Project
a. https://www.txdot.gov/inside-txdot/projects/studies/fort-worth/dfw-connector.html
2 Southeast Connector
a. https://www.txdot.gov/inside-txdot/projects/studies/fort-worth/southeast-connector.html
3 SR 520 – Montlake Project
a. https://www.wsdot.wa.gov/projects/sr520/montlake/home
4 Hotel and Convention Center in the City of Devils Lake
a. file:///C:/Users/lab/Downloads/Convention-Center-Hotel-RFP-150626.pdf
5 Hotel Conference Center Fredericksburg, Texas
a. http://www.fbgtx.org/DocumentCenter/View/1045/RFQ—Development-of-Hotel-Conference-Center—04152016?bidId=
For the above projects, answer the following questions.
1. Who is the Owner
2. Type of Contract
3. Method of selection of Developer or Contractor
4. Was a Criteria in selection
5. How many Developers or Contractors responded to the RFQ?
6. Was there a short list?
7. Who was on the short list?
8. Who was selected as the Developer or Contractor
9. What was the cost for the project?
10. How was the project funded?
11. Was there a theme or primary look or function the owner was looking to fulfill.
12. What was the timeline from the RFQ to Section of developer or contractor?
13. Was there anything unusual about this project?
Part B
Research and find two current projects that are in the RFQ or RFP stage, answer the same questions that was for the project above.